Mixed-Use Residential Development Wastewater Lift Station

Phoenix, Arizona Mixed Use Development Wastewater Lift Station

500 GPM
25.4′ TDH

jweddell500gpm - 1,000gpm, Mixed Use, Public Works, Residential, Residential Development, Wastewater

Phoenix, Arizona Mixed Use Development Wastewater Lift Station Lift Station Project Assets DESIGN DRAWINGS PANEL DESIGN SITE-PLANS For this mixed-use residential development wastewater lift station, Romtec Utilities provided the owners with a system to meet this premium downtown residential and commercial setting that provides a variety of amenities. This mixed-use development wastewater lift station is housed inside of the building, a unique building that features pools, a spa, lounge and kitchen, cabanas, citrus groves, and ...
Industrial Building Addition Stormwater Lift Station in California

City of Orange, California Industrial Building Addition Stormwater Lift Station

100 GPM
15′ TDH

jweddell500gpm - 1,000gpm, Industrial, Public Works, Stormwater

City of Orange, California Industrial Building Addition Stormwater Lift Station Stormwater Lift Station Project Assets DESIGN DRAWINGS PANEL DESIGN SITE-PLANS A developer was adding on to their facility and required an industrial building stormwater lift station. This facility, located in Orange, California, was an addition to their existing industrial facility. The City of Orange required treatment of stormwater through a modular wetlands system. Romtec Utilities designed, manufactured, and supplied the stormwater lift station that pumps ...
School Expansion Wastewater Lift Station in Sullivan, Illinois

Sullivan, Illinois School Expansion Requiring New Wastewater Lift Station

150 GPM
15′ TDH

jweddell100gpm - 300gpm, Municipal, Public Works, Schools, Wastewater

Sullivan, Illinois School Expansion Requiring New Wastewater Lift Station Wastewater Lift Station Project Assets DESIGN DRAWINGS PANEL DESIGN SITE-PLANS This project involved a high school expansion wastewater lift station, as a new building was made to make room for the combining of the middle school in Sullivan, Illinois. This was a unique project because the school expansion replaced the wastewater lift station, but the old system was still active and in the footprint of the ...
booster Station for the City of Van Alstyne, Texas

City of Van Alstyne, Texas Booster Station

jweddell1,000gpm - 5,000gpm, 100-Year Storm, Flood Control, Municipal, Pacific, Public Works, Stormwater, Stormwater Runoff

City of Van Alstyne, Texas Booster Station Booster Station Project Assets DESIGN DRAWINGS PANEL DESIGN SITE-PLANS The state of Texas has experienced unprecedented population growth since 2020 but the infrastructure of the Lone Star State wasn’t prepared to service over 2 million more residents. (Texas Population by Year - 2025 Update | Neilsberg) Infrastructure in Texas is being expanded and improved at a faster pace in order to keep up with demand. Developers and engineers ...
Stormwater with Stepped Down Wet Well in Anchorage, Alaska

Anchorage, Alaska Stormwater Lift Station With Stepped Down Wet Well

1610 GPM
18.2′ TDH

jweddell1,000gpm - 5,000gpm, 100-Year Storm, Flood Control, Municipal, Pacific, Public Works, Stormwater, Stormwater Runoff

Anchorage, Alaska Stormwater Lift Station With Stepped Down Wet Well Stormwater Lift Station Project Assets DESIGN DRAWINGS PANEL DESIGN SITE-PLANS This project was for a community in Anchorage, Alaska, called Eagle River, that had experienced flooding issues to personal property over the years. The community required a stormwater lift station with a stepped down wet well. Flooding became a problem due to freeze-thaw weather conditions and poor surface drainage. The site of the housing development ...