This high flow wet/dry lift station replacement was installed “in the sand” of Main Beach with three dry pit pumps in a 26-feet-deep precast rectangular vault. Triplex split case pumps, sump pumps, an intake/exhaust fan, lights, valves, stairs, and a mezzanine were all provided in the package. The Allen Bradley PLC control panel, flow transmitter, and junction box are located in a control building. Sophisticated SCADA, 3 levels of redundancy, auxiliary power, and an HDPE wet well are all primary components of this package lift station.
City of Madera, CA | 550 GPM - 25' TDH
The Valley Knolls Development in Carson City, Nevada required a new wastewater station to service the new housing development.
Wastewater Pump Station Upgrade - City of Los Angeles
This project involves upgrading an existing waste management facility which has a large stormwater and smaller wastewater pump station.
City of Riverside, CA - Wastewater Pump Station
The California Air Resource Board (CARB) needed a wastewater pump station for their new facility being built in Riverside.
City of Shafter, CA - Wastewater Lift Station
The City of Shafter wanted a pumping system that met their standards and will be operated and maintained by the city.