The City of Shafter wanted a pumping system that met their standards and will be operated and maintained by the city.
Visalia, California Logistics Wastewater Lift Station
50 GPM
35′ TDH
Visalia, California Logistics Wastewater Lift Station Logistics Facility Wastewater Lift Station Project Assets DESIGN DRAWINGS PANEL DESIGN SITE-PLANS This logistics facility wastewater lift station in Visalia, California services a development by CapRock Partners. We worked with Caprock before on their HLA6 logistics facility, and they followed up directly with us after the completion of that project to get the design on this lift station started. This project is for a logistics building sewer lift station ...
Residential Development Wastewater Pump Station in Huntington Beach, CA
150 GPM
13.8′ TDH
Huntington Beach, California Housing Development Wastewater Lift Station Development Wastewater Pump Station Project Assets DESIGN DRAWINGS PANEL DESIGN SITE-PLANS This housing development wastewater lift station is for a new neighborhood, known as Seamark, in Huntington Beach, California. Romtec Utilities designed, manufactured, and supplied this wastewater lift station for the developers, Brookfield Properties. Fuscoe Engineering brought us into this project after they connected us with the developers. We provided a wastewater lift station along with a ...
Wastewater Pump Station in Beaumont, California – Middle Oak Valley LS
763 GPM
220′ TDH
Beaumont, California Phased Residential Wastewater Lift Station Project Assets DESIGN DRAWINGS PANEL DESIGN SITE-PLANS For this phased residential wastewater lift station, we partnered with Meritage Homes, the developer of The Fairways in Beaumont, California. The residential community includes a resort pool, lap pool, splash pad, fitness center, and the Morgongo Golf Club at Tukwet Canyon. This phased residential development wastewater pump station project has been ongoing for many years and met the City of Beaumont’s EMWD ...
Huntington Beach, California Housing Development Stormwater Lift Station
460 GPM
14′ TDH
Huntington Beach, California Housing Development Stormwater Lift Station Project Assets DESIGN DRAWINGS PANEL DESIGN SITE-PLANS New Housing Development Stormwater Lift Station A new housing development stormwater lift station was needed for a construction project in Huntington Beach, California. This was for a new housing development called Seamark that involved 85 homes being built next to Gisler Park. Fuscoe connected us with the project, as they were the civil engineer and brought us into contact with ...




