The Mineral Point housing development in the City of Stanwood, Washington required a wastewater lift station to convey sewage to treatment for newly constructed houses.
City of Ashland|Ashland, OR|156 GPM - 55.7' TDH
Romtec Utilities retrofitted an existing wastewater lift station to meet rising flow rates in a neighborhood area of Ashland, Oregon.
Sammamish Plateau Water|Sammamish, WA|110 GPM - 66.5' TDH
Romtec Utilities worked with SPWSD on a similar project to develop a new submersible lift station design standard that changed from its previous wet/dry configuration pump systems.
Roseburg Urban Sanitary Authority|Roseburg, OR|258 GPM - 16.9' TDH
The Roseburg Urban Sanitary Authority needed a new lift station to handle medium flows of sewage from a residential neighborhood. This precast concrete wet well is a deep well for sewer, going nearly 30 feet below grade.
Long Beach Exchange|Long Beach, CA|150 GPM - 15.9' - 18.7' TDH
Romtec Utilities designed and supplied five stormwater pump stations for a new commercial development in Long Beach, California.