The new Bay 101 casino required 6 stormwater pump stations to handle low flows of stormwater in San Jose, California. Each pump station will help serve new hotels as this casino facility expands. These pump stations needed to meet the low flow requirements while maintaining consistent head conditions.
United States Postal Service|Portland, OR|100 GPM - 29.7' TDH
A new distribution center for the United States Postal Service in Portland, Oregon required a wastewater lift station. The lift station handles both wastewater and stormwater flows because the stormwater that is collected onsite is essentially wastewater due to fuel and other contaminants from a truck loading area.
Cedar Point Sports Center|Sandusky, OH|75 GPM - 60' TDH
Romtec Utilities provided a complete wastewater lift station for a sports park in Ohio. This lift station collects wastewater from the on-site facilities and then pumps into an existing force main.
City of Victorville|Victorville, CA|75 GPM - 23.3' TDH
The City of Victorville needed to replace an existing lift station that had been converted to a manhole. The new lift station would handle medium flows of wastewater, and pump it uphill to gravity and off to treatment.
Bureau of Reclamation|Klamath Falls, OR|90 GPM - 20.0' TDH
The Bureau of Reclamation needed a new wastewater lift station to handle medium flows of wastewater in Klamath Falls, Oregon. This pumping system includes 2 hp Ebara submersible pumps engineered in a duplex configuration to meet the anticipated sewage flow and provide redundancy.