This stormwater pump station is part of the Santa Clara Valley Transportation Authority’s (VTA) stormwater reclamation system.
Boardwalk Pipeline Partners|Houston, TX|100 GPM - 11' TDH
The City of Los Angeles needed to construct a new 54” force main to increase sewer capacity and add redundancy to an existing 48” force main at Marina del Rey.
Clear Creek Tahoe|Carson City, NV|99 - 165 GPM - 224.7' - 267' TDH
The new residential development at Clear Creek Tahoe needed two new wastewater lift stations. The location of the development has many elevation changes and to successfully pump the sewage off to treatment, two lift stations were necessary.
Bay 101|San Jose, CA|31-187 GPM - 10.2'-20.6' TDH
The new Bay 101 casino required 6 stormwater pump stations to handle low flows of stormwater in San Jose, California. Each pump station will help serve new hotels as this casino facility expands. These pump stations needed to meet the low flow requirements while maintaining consistent head conditions.
United States Postal Service|Portland, OR|100 GPM - 29.7' TDH
A new distribution center for the United States Postal Service in Portland, Oregon required a wastewater lift station. The lift station handles both wastewater and stormwater flows because the stormwater that is collected onsite is essentially wastewater due to fuel and other contaminants from a truck loading area.