The development of multiple retail outlets in San Clemente, California required the installation of a stormwater pump station. The system needed to work with the specifications of another pumping system by discharging collected stormwater through an on-site biofiltration treatment system.
Bay 101|San Jose, CA|31-187 GPM - 10.2'-20.6' TDH
The new Bay 101 casino required 6 stormwater pump stations to handle low flows of stormwater in San Jose, California. Each pump station will help serve new hotels as this casino facility expands. These pump stations needed to meet the low flow requirements while maintaining consistent head conditions.
Doheny Village Stormwater|Dana Point, CA|50 GPM - 14' TDH
City improvements for the Doheny Village in Dana Point, California required a new stormwater pump station for the residential revitalization. To meet the required flows, the new pump station utilized a 1/3 hp Goulds submersible pump in a simplex configuration.