Romtec Utilities worked with SPWSD on a similar project to develop a new submersible lift station design standard that changed from its previous wet/dry configuration pump systems.
Gossamer Grove|Shafter, CA|500, 1000 GPM - 27.7', 56.8' TDH
Gossamer Grove is the largest housing development in the City of Shafter. Romtec Utilities provided the wastewater lift station for this development after establishing a standard lift station configuration with the City on previous projects.
Roseburg Urban Sanitary Authority|Roseburg, OR|258 GPM - 16.9' TDH
The Roseburg Urban Sanitary Authority needed a new lift station to handle medium flows of sewage from a residential neighborhood. This precast concrete wet well is a deep well for sewer, going nearly 30 feet below grade.
Taverner Ridge|Ridgefield, WA|330 GPM - 118' TDH
Romtec Utilities designed, engineered, and manufactured a package wastewater lift station for a new housing development in Ridgefield, Washington.
Sage Apartments|Cerritos, CA|23, 2850 GPM - 25.4', 17.5' TDH
Sage at Cerritos is a new luxury apartment complex in Cerritos, California, a suburb of Los Angeles. Romtec Utilities provided two stormwater pump stations for this residential development aptly referred to as “big stormwater” and “little stormwater”.