Romtec Utilities designed, supplied, and manufactured a powerful stormwater pump station with an integrated control building. The pump station was installed as part of a large estuary restoration project and is used to prevent inland flooding.
City of Junction City|Junction City, OR| 335 GPM - 128' TDH
Romtec Utilities designed and supplied a wastewater lift station and control building to replace an existing municipal sewer system in the City of Junction City, Oregon.
Kitsap County | Bremerton, WA | 130 GPM - 61.4' TDH
Romtec Utilities was hired to provide the design and supply of a wastewater lift station for Settlers Field, a new residential development in Bremerton, Washington, across the sound from Seattle.
Rivers West Development|North Bend, WA| 130 GPM - 12.5' TDH
Romtec Utilities designed and supplied a stormwater pump station for a small housing development in North Bend, Washington.
Pacific Rim Apartments|Warrenton, OR| 95 GPM - 36.3' TDH
The construction of a new apartment complex in Warrenton, Oregon required a lift station to handle wastewater from approximately 60 new apartment units.





