Romtec Utilities provided the design and supply of this wastewater lift station, including all structural and mechanical systems for a new affordable housing development called Mission Garden.
Sammamish Plateau Water|Sammamish, WA|110 GPM - 66.5' TDH
Romtec Utilities worked with SPWSD on a similar project to develop a new submersible lift station design standard that changed from its previous wet/dry configuration pump systems.
Gossamer Grove|Shafter, CA|500, 1000 GPM - 27.7', 56.8' TDH
Gossamer Grove is the largest housing development in the City of Shafter. Romtec Utilities provided the wastewater lift station for this development after establishing a standard lift station configuration with the City on previous projects.
Taverner Ridge|Ridgefield, WA|330 GPM - 118' TDH
Romtec Utilities designed, engineered, and manufactured a package wastewater lift station for a new housing development in Ridgefield, Washington.
Clear Creek Tahoe|Carson City, NV|99 - 165 GPM - 224.7' - 267' TDH
The new residential development at Clear Creek Tahoe needed two new wastewater lift stations. The location of the development has many elevation changes and to successfully pump the sewage off to treatment, two lift stations were necessary.