Romtec worked with Marquess & Associates to provide them with the best value from an engineering, construction, and overall cost of maintenance standpoint.
Heart of Los Angeles|Los Angeles, CA| 80 GPM - 20.4' TDH
Blois Construction brought the HOLA project to Romtec Utilities to provide a wastewater lift station. Romtec Utilities, along with Blois Construction and Brandow & Johnston Engineers worked together to get the design of the station approved by LA County.
Battleground School District|Vancouver, WA| 127 GPM - 103.4' TDH
Romtec Utilities was asked to design and supply a wastewater lift station for the Battleground School District in Southern Washington. The new pumping system was one aspect of a large facilities improvement project for the school grounds and would be owned by the school district.
University of California Merced|Fresno, CA|720 GPM - 48.9' TDH
The University of California, Merced needed a new wastewater lift station for the expansion of its campus. Two 20 hp Vaughan chopper pumps were included to meet the high flow requirements.
Magnolia Pacific Wastewater|Santa Ana, CA|3,146 GPM - 21.3' TDH
One aspect during the construction of Magnolia Pacific Technical School was a stormwater pump station. This system would handle extremely high flows of stormwater and pump it to treatment.





