The Rockefeller Group purchased 7.81 acres of improved land in order to build the Airway Industrial Park in Otay Mesa, California.
Hancock Parkway Properties | 450 GPM - 15.8' TDH
The site of the new development is close to the Santa Clara River, driving the need for all the stormwater runoff to be collected and treated in order to keep contaminated water from making its way into the Santa Clara.
Union Pacific City of Industry | 150 GPM - 15.3' TDH
Romtec Utilities supplied a stormwater pump station for a new Union Pacific Railroad Maintenance Office. The lift station was needed to empty a stormwater detention pond, and pump the water to an existing gravity drain system.
Bridge Development Partners | 50 GPM - 15.3' TDH
For their new development, the location was in need of a Romtec Utilities stormwater lift station to collect runoff water from the building and parking lot areas.
1025 Sweetwater Road|Spring Valley, CA| 200 GPM - 12.4' TDH
NLA Spring Valley LLC was constructing a commercial development and in need of a stormwater lift station. This Romtec Utilities stormwater pump system was needed for small and 100-year storm events for a commercial development.