The new headquarters for the Sacramento Municipal Utility District needed this package pump station to handle high flows of stormwater.
Channel Islands University|Camarillo, CA|2,500 GPM - 25' TDH
A university needed this package stormwater pump station designed to meet the high flow requirements for draining a detention pond. A flooded inlet line from the detention pond is pumped by submersible centrifugal pumps in a duplex configuration.
City of Colton, CA – Stormwater Runoff Pump Station
74.5GPM
19.7′ TDH
Laguna Canyon Group|San Clemente, CA | 14 GPM - 22' TDH
The development of multiple retail outlets in San Clemente, California required the installation of a stormwater pump station. The system needed to work with the specifications of another pumping system by discharging collected stormwater through an on-site biofiltration treatment system.
Santa Ana Delhi | Orange County, CA
This project is a new lift station handling low flows in the Santa Ana Delhi Channel in Newport Beach, California. This system collects stormwater in a 10’ inner diameter (ID) wet well that reaches 32’ in depth. In the bottom of the well, three Ebara 20 horsepower (HP) submersible pumps sit ready to pump out the water.





