For their new development, the location was in need of a Romtec Utilities stormwater lift station to collect runoff water from the building and parking lot areas.
Broadway Business Park | 50 GPM - 25.4' TDH
In the Broadway Business Park Project, Romtec Utilities supplied a stormwater pump station for a new development by Ninety/Fifty LLC.
Industrial Crating and Packing|Tukwila, WA| 512 GPM - 29.1' TDH
Woodburn Development LLC, with ICON Construction and Development, Emerio Design, and Canby Excavations were in need of a wastewater lift station for a new development. The Romtec supplied waste water wet well is a precast 10’ inner diameter (ID) well that is 36’ in depth.
1025 Sweetwater Road|Spring Valley, CA| 200 GPM - 12.4' TDH
NLA Spring Valley LLC was constructing a commercial development and in need of a stormwater lift station. This Romtec Utilities stormwater pump system was needed for small and 100-year storm events for a commercial development.
Santa Ana Delhi | Orange County, CA
This project is a new lift station handling low flows in the Santa Ana Delhi Channel in Newport Beach, California. This system collects stormwater in a 10’ inner diameter (ID) wet well that reaches 32’ in depth. In the bottom of the well, three Ebara 20 horsepower (HP) submersible pumps sit ready to pump out the water.