Trans Bay Cable

Trans Bay Cable|Pittsburg, CA | 500 GPM - 25' TDH

jweddell100-Year Storm, 500gpm - 1,000gpm, Collection Systems, Industrial, Industrial Process Water featured, Industrial Water, Pacific, Process Water, Stormwater, Stormwater Collection, Stormwater Featured, Transportation

Romtec Utilities designed and supplied two stormwater pump stations for a converter station in the City of Pittsburg, California. The two systems are necessary to supply collected stormwater to an onsite water treatment system before being discharged into the nearby bay.

Laguna Canyon Group|San Clemente, CA | 14 GPM - 22' TDH

jweddell5gpm - 50gpm, Commercial Development Stormwater, Flood Control, Mixed Use, Mixed Use Development, Modular Wetlands, Pacific, Parking Lot Drainage, Stormwater, Stormwater Collection, Stormwater Runoff, Stormwater Treatment

The development of multiple retail outlets in San Clemente, California required the installation of a stormwater pump station. The system needed to work with the specifications of another pumping system by discharging collected stormwater through an on-site biofiltration treatment system.