The Line at Santa Ana is a new mixed-use infill development that will add 228 new apartments and 4,000 square feet of commercial space across several buildings. Romtec Utilities was hired to provide two engineered pumping systems that would discharge treated stormwater into the storm sewer.
Trans Bay Cable|Pittsburg, CA | 500 GPM - 25' TDH
Romtec Utilities designed and supplied two stormwater pump stations for a converter station in the City of Pittsburg, California. The two systems are necessary to supply collected stormwater to an onsite water treatment system before being discharged into the nearby bay.
Port of Tacoma|Tacoma, WA | 1090-1430 GPM - 25.6'-31.6' TDH
The Port of Tacoma required three pump stations to send untreated stormwater through onsite water treatment systems. All stormwater that enters the marina will first travel through one of these three systems before being treated to improve the water quality at the port.
Mitsubishi Gas Chemical|Forest Grove, OR | 475 GPM - 19.7' TDH
The construction of a hydrogen peroxide refinement plant for the Mitsubishi Gas Chemical Company (MGC) required a pump station to collect and discharge stormwater to an onsite treatment system.
Educational Realty Trust|Sacramento, CA | 24.1 GPM - 24.1' TDH
Romtec Utilities designed and supplied a stormwater pump station for the new Army Depot Park in Sacramento, California. The pump station was designed for the 10-year storm and is capable of pumping 930 gallons of stormwater per minute.