Romtec Utilities was contacted to provide a design service order for a new booster pump station and control building for a housing development in the Town of Samoa. This booster pump station was designed to meet the immediate and future flow requirements of the development as it continued to expand.
Southgate Water District|Lone Tree, CO| 125 GPM - 75' TDH
Romtec Utilities designed and supplied a booster pump station and an integrated control building for an upscale development. This booster system regulates water pressure for the newly constructed homes.
Clark Regional Wastewater District|Ridgefield, WA| 258 GPM - 94.7' TDH
Romtec Utilities designed and supplied a wastewater lift station for a new residential development in the City of Ridgefield, Washington. The development and lift station will be completed in phases to meet the growing flow rates of the service area.
Gossamer Grove|Shafter, CA|500, 1000 GPM - 27.7', 56.8' TDH
Gossamer Grove is the largest housing development in the City of Shafter. Romtec Utilities provided the wastewater lift station for this development after establishing a standard lift station configuration with the City on previous projects.
Taverner Ridge|Ridgefield, WA|330 GPM - 118' TDH
Romtec Utilities designed, engineered, and manufactured a package wastewater lift station for a new housing development in Ridgefield, Washington.