This high flow wet/dry lift station replacement was installed “in the sand” of Main Beach with three dry pit pumps in a 26-feet-deep precast rectangular vault. Triplex split case pumps, sump pumps, an intake/exhaust fan, lights, valves, stairs, and a mezzanine were all provided in the package. The Allen Bradley PLC control panel, flow transmitter, and junction box are located in a control building. Sophisticated SCADA, 3 levels of redundancy, auxiliary power, and an HDPE wet well are all primary components of this package lift station.
Victorville, California Septic Sewer Conversion Wastewater Lift Station
72.7 GPM
9.6′ TDH
Victorville, California Septic to Sewer Conversion Wastewater Lift Station Wastewater Lift Station Project Assets DESIGN DRAWINGS PANEL DESIGN SITE-PLANS This was a unique project in Victorville, California for a septic to sewer conversion wastewater lift station. Due to environmental concerns with septic systems near the Mojave River, the City of Victorville needed to come up with a solution. The limited number of homes being converted over from septic to the sewer system resulted in very low ...
Wastewater Pump Station Upgrade - City of Los Angeles
This project involves upgrading an existing waste management facility which has a large stormwater and smaller wastewater pump station.
City of Riverside, CA - Wastewater Pump Station
The California Air Resource Board (CARB) needed a wastewater pump station for their new facility being built in Riverside.
City of Shafter, CA - Wastewater Lift Station
The City of Shafter wanted a pumping system that met their standards and will be operated and maintained by the city.