The PDX TCORE pump station is the fifth project RU has done for the Port of Portland in the last five years. The station is the main wastewater pump station for all of PDX.
Charles T. Parker Extension | Scappoose, OR | 426 GPM - 67.8' TDH
Romtec Utilities worked with Cardno as they were the project driver. RU designed and supplied the lift station to fit the needs of the large development.
Dolce Vita Development | Granbury, TX | 486 GPM - 29' TDH
Romtec Utilities was contacted by Texas Water Engineers (TXWE) who was the utilities engineer on the project regarding pump selection for the private development.
Georgia Transmission Corporation|Forsyth, GA| 55 GPM - 49' TDH
Romtec Utilities was contacted to design and supply a wastewater lift station to replace an aging septic sewer systems for the Georgia Transmission Corporation’s (GTC) Electric Cooperative Training Center in Georgia.
Culbertson Power Plant|Culbertson, CA|100 GPM - 25' TDH
This power generation facility installed a package lift station designed for medium sewage flows of industrial wastewater. To protect the submersible solids-handling pumps, an inlet line deflector panel was included in the design. The wet well was protected from off-gassing and corrosion by an interlocking fiberglass lining. Conductive probes are used for primary and backup liquid level-sensing with an outdoor UL listed control panel. The panel is outfitted with a basic alarm and an autodialer for telecommunications.