Residential Development Wastewater Pump Station in Huntington Beach, CA
150 GPM
13.8′ TDH
Residential Development Wastewater Pump Station in Huntington Beach, CA Project Assets DESIGN DRAWINGS PANEL DESIGN SITE-PLANS Romtec Utilities was proud to partner with Fuscoe Engineering, Lennar, and L&S Construction on this residential development wastewater pump station in Huntington Beach, California. Huntington Beach is famous for its long stretch of beach that encompasses 8.5 miles and provides a variety of places for beachgoers to gather. The population was 198,711 at the 2020 census. The city is ...