Rockefeller Group – Stormwater Lift Station
Stormwater Lift Station Project Description
The Rockefeller Group purchased 7.81 acres of improved land in order to build the Airway Industrial Park in Otay Mesa, California. The land and the development were for a 135,621 square foot distribution center.
Initially, there was concern that the stormwater peak flow could be as high as 30 CFS. Romtec, working with Kimley-Horn and Associates Inc., Ware Malcomb, and Bushra Tsai were able to develop a new drainage plan and reduce the peak flow to 4.5 CFS which made the development of the site feasible.
Dempsey Construction was the general contractor and subcontracted Rand Engineering for the utilities on this project. Romtec Utilities worked with Rand Engineering, who installed the lift station. Rand had a great understanding of the pumping system and the project and they too were very active and motivated in the development of the pumping plan.
Stormwater Lift Station Design
Romtec Utilities and Romtec, Inc. have worked with Kimley-Horn offices across the US on a variety of projects incorporating multiple building types, and pump stations across all water types. These projects include ‘Fresh & Easy Wastewater’, ‘1025 Sweetwater Road’, ‘Sprouts Mira Mesa’ and many others that can be found on Romtec Utilities’ website.
The pump station features:
– Precast 8′ ID x ~17′ deep
– Duplex 10hp Ebara Submersible Pumps
– Primary Controller: Alternator Relay
– Primary Level Sensing: (4) NOLTA MS1 Floats
– NEMA 4 Painted Steel Enclosure
The Airway Industrial Park features a 32’ clear height, 185’ truck yard, truck trailer parking and an efficient office design.
The property is zoned for industrial use and will be designated for single-tenant or multi-tenant occupancy.
At Romtec Utilities we have an experienced team of engineers that can help you with the design of your project and come up with a pump station that fits your needs. If you have questions about a project, reach out to Romtec Utilities sales at 541-496-9678.
What Romtec Utilities Provided
- Pump Station Design & Engineering
- Package Pump Station Supplier
- Package Pump Station Manufacturer
- On-Site Construction Adviser
- On-Site Start-Up Management
2020 | 14.4′ |