The pump system was designed to meet city stormwater detention requirements, which required new developments to carefully manage runoff. After construction, stormwater must be collected and released at the same rate as it was before the site was developed.
City of Camas, WA – Stormwater Pumping System
600GPM
16.0′ TDH
Romtec Utilities supplied Georgia Pacific with a stormwater runoff lift station that would meet their needs.
City of Colton, CA – Stormwater Runoff Pump Station
74.5GPM
19.7′ TDH
City of Colton, CA - Stormwater Runoff Pump Station Project Assets DESIGN DRAWINGS PANEL DESIGN SITE-PLANS Stormwater Runoff Pumping System Project Description West Colton is a neighborhood in Colton, California. Colton is in San Bernardino County and is known as “Hub City” as a suburb of San Bernardino. The population was 53,909 in the 2020 census. The Santa Ana River flows through the area. This city is home to one of the busiest at grade ...
Hancock Parkway Properties | 450 GPM - 15.8' TDH
The site of the new development is close to the Santa Clara River, driving the need for all the stormwater runoff to be collected and treated in order to keep contaminated water from making its way into the Santa Clara.
Airway Industrial Park| Otay Mesa, CA | 2020 GPM - 14.4' TDH
The Rockefeller Group purchased 7.81 acres of improved land in order to build the Airway Industrial Park in Otay Mesa, California.





