Pleasant Valley RV Park – High-Capacity Triplex Lift Station
Project Description
A residential boom town of employees from nearby natural gas mining facilities needed a large lift station to handle over 1.2 MGD of wastewater. Submersible Ebara sewage pumps in a triplex configuration were included for the new and future pumping rates resulting from residential growth. The lift station controls are located in a nearby control building. The UL listed control panel utilizes floats for primary and backup level controls, an autodialer for communications, and a permanent onsite generator for backup power.
What Romtec Utilities Provided
- Lift Station Design & Engineering
- Package Lift Station Supplier
- Package Lift Station Manufacturer
- Lift Station Site Plan Layout Designer
- On-Site Lift Station Construction Adviser
- On-Site Start-Up Management
844 | 38′ |
GPM | TDH |
Why They Chose Romtec Utilities
BIP 40, LLC had a development that was an RV park for employees at natural gas mining facilities in the area. These companies expanded rapidly and hired staff so quickly that a boom town housing market was created. BIP 40 and its engineering firm (DJ & A, P.C.) needed a large lift station to be designed, manufactured, supplied, and installed as quickly as possible. Romtec Utilities worked hard to design a packaged lift station that would be a long term solution for the RV park while also meeting expectations of speed. The lift station design was approved by GEOMAP Company (reviewing agency), manufactured, supplied, and started-up by Romtec Utilities within just four months of starting the project.