IBM Resiliency Services|Boulder, CO|270 GPM - 36' TDH

jweddell100gpm - 300gpm, Data Centers, Mountain, Replacements & Retrofits, Wastewater

The IBM Boulder Data Center needed to replace a wastewater lift station with a new system to handle medium flows of wastewater generated at the facility. A precast concrete sump includes a pedestrian rated hatch with a safety grate for reliable fall protection. Two, Ebara 5 hp pumps were included in the design for redundant pumping capabilities, and a prefabricated valve vault structure contains check valves and control valves. A UL listed control panel with phase monitoring was engineered in a NEMA 4X stainless steel enclosure for installation outdoors.