This new commercial complex required two new stormwater pump stations designed to meet low flows of runoff. The manholes and hatches were designed at grade to integrate seamlessly with the brick patio and walkway. Submersible centrifugal pumps in a duplex configuration discharge to below grade valve assemblies accessible by valves cans. The UL listed control panels are contained by stainless steel NEMA enclosures and include intrinsically safe barriers. Both lift stations were designed with the same primary components for site standardization.
City of Lemoore|City of Lemoore, CA| 311 GPM - 16.5' TDH
Romtec Utilities designed, supplied, and installed a wastewater lift station for a new housing development in Lemoore, California. The lift station connects to the city sewer with medium flows of wastewater to treatment.
City of Shafter|Shafter, CA| 414 GPM - 27.5' TDH
Romtec Utilities was contacted to design and supply a replacement wastewater lift station for the City of Shafter in Rodriguez Park. The new system was needed to handle growing flows from the area while modernizing the infrastructure.
Highgate Community|Bakersfield, CA | 450 GPM - 50 TDH
Romtec Utilities supplies its customers with the best systems for the customers’ needs; the Highgate Community project is a project that required more than just a basic system. This is a Wastewater pump station in Bakersfield, California, constructed to serve a new development by Castle and Cooke.
Hancock Parkway Properties | 450 GPM - 15.8' TDH
The site of the new development is close to the Santa Clara River, driving the need for all the stormwater runoff to be collected and treated in order to keep contaminated water from making its way into the Santa Clara.





