A residential development project in 2008 needed a new lift station to handle medium flows of sewage from the houses. The development was put on hold, and in 2013, Romtec Utilities supplied equipment to make the lift station operational.
Taverner Ridge|Ridgefield, WA|330 GPM - 118' TDH
Romtec Utilities designed, engineered, and manufactured a package wastewater lift station for a new housing development in Ridgefield, Washington.
Kings Mountain Energy Center|Kings Mountain, NC|480 GPM - 35' TDH
A new HRSG system required 3 industrial pump stations to provide water for its processes. This HRSG blowdown pump station needed to handle extreme pumping conditions.
City of Shafter|Shafter, CA|350 GPM - 19.6' TDH
The City of Shafter in California needed a new sewer lift station to replace an existing system with out-of-date components.
Middletown Energy Center|Middletown, OH|480-850 GPM - 25'-35' TDH
Construction of a new combined cycle power plant in Middletown, OH required 3 pump stations for the operation of its HRSG system. Middletown Energy Center uses natural gas and HRSG to generate power, this process requires significant amounts of water for operation.