Romtec Utilities was contacted to provide the design and supply of a wastewater lift station as a complete package for a new housing development in Vancouver, Washington. The location of the development required Romtec Utilities to adhere to the robust design standards of the Clark Regional Wastewater District (CRWWD) for new lift stations.
City of Junction City|Junction City, OR| 335 GPM - 128' TDH
Romtec Utilities designed and supplied a wastewater lift station and control building to replace an existing municipal sewer system in the City of Junction City, Oregon.
City of Puyallup|Puyallup, WA| 362 GPM - 40.5' TDH
A residential development project in 2008 needed a new lift station to handle medium flows of sewage from the houses. The development was put on hold, and in 2013, Romtec Utilities supplied equipment to make the lift station operational.
Taverner Ridge|Ridgefield, WA|330 GPM - 118' TDH
Romtec Utilities designed, engineered, and manufactured a package wastewater lift station for a new housing development in Ridgefield, Washington.
Kings Mountain Energy Center|Kings Mountain, NC|480 GPM - 35' TDH
A new HRSG system required 3 industrial pump stations to provide water for its processes. This HRSG blowdown pump station needed to handle extreme pumping conditions.