The Bureau of Reclamation needed a new wastewater lift station to handle medium flows of wastewater in Klamath Falls, Oregon. This pumping system includes 2 hp Ebara submersible pumps engineered in a duplex configuration to meet the anticipated sewage flow and provide redundancy.
Magnolia Pacific Wastewater|Santa Ana, CA|78 GPM - 13.7' TDH
The construction of the Magnolia Pacific Technical School in Santa Ana, California needed a wastewater lift station to handle its sewage with medium flows of 100 gpm. To meet these flow requirements, Romtec Utilities engineered a lift station with 5 hp Weil submersible grinder pumps in a duplex configuration.
Doheny Village Stormwater|Dana Point, CA|50 GPM - 14' TDH
City improvements for the Doheny Village in Dana Point, California required a new stormwater pump station for the residential revitalization. To meet the required flows, the new pump station utilized a 1/3 hp Goulds submersible pump in a simplex configuration.
McCormick Woods|Port Orchard, WA|100 GPM - 104.9' TDH
In Port Orchard, Washington, new residential developments have been ongoing around the McCormick Woods Golf Course. The most recent development required a new lift station to handle medium flows of sewage for 200 new homes.
Port of Vancouver|Vancouver, WA|100 GPM - 18.4' TDH
To accommodate new rails line and a new administration building, the Port of Vancouver needed a new lift station to handle medium flows of sewage from the new facility.