Romtec Utilities was contacted to design and supply a stormwater pump station as part of an improvement project at an industrial power switch station in Trenton, New Jersey. This is one of several locations where aging infrastructure is being replaced by the local electric company, Public Service Enterprise Group, or PSE&G.
Georgia Transmission Corporation|Forsyth, GA| 55 GPM - 49' TDH
Romtec Utilities was contacted to design and supply a wastewater lift station to replace an aging septic sewer systems for the Georgia Transmission Corporation’s (GTC) Electric Cooperative Training Center in Georgia.
Exelon|Medway, MA| 30 - 70 GPM - 10' - 35'
The expansion of the Exelon Medway Generating Station required four unique pump stations to support future operations.
Orlando Utility Commission|Orlando, FL| 100, 800 GPM - 85.6', 135' TDH
Romtec Utilities was hired to design and supply pump stations to support a combined-cycle power generation process that requires significant amounts of recirculated water to function for the Orlando Utility Commission in Orlando, FL.
DOW Chemical|South Charleston, WV| 60 GPM - 25' TDH
Union Carbide Corporation, a subsidiary of DOW Chemical, required a new stormwater pump station as part of a larger groundwater containment and remediation system in South Charleston, West Virginia.