Construction of a new combined cycle power plant in Middletown, OH required 3 pump stations for the operation of its HRSG system. Middletown Energy Center uses natural gas and HRSG to generate power, this process requires significant amounts of water for operation.
Middletown Energy Center|Middletown, OH|480-850 GPM - 25'-35' TDH
Construction of a new combined cycle power plant in Middletown, OH required 3 pump stations for the operation of its HRSG system. Middletown Energy Center uses natural gas and HRSG to generate power, this process requires significant amounts of water for operation.
Dan River Steam Station|Eden, NC|300 GPM - 20' TDH
Duke Energy replaced the Dan River Steam Station with a new gas fired power plant and needed a new pump station to handle medium flows of blow down water from the heat recovery steam generator.
BAE Acetic Acid Plant|Kingsport, TN|300 GPM - 30' TDH
BAE Systems, Inc. needed a new pumping system that could handle medium flows of industrial wastewater that was also skid mounted.
Utica East Ohio Midstream LNG Plant|Kensington, OH|150 GPM - 59' TDH
Utica East Ohio Midstream needed a new pump stations to handle low flows of stormwater runoff at its new Kensington Plant in Ohio. To responsibly contain potentially hazardous stormwater from the topsoil, this pump station was designed with a double-wall fiberglass wet well with interstitial leak detection. The pumping system also included corrosion resistant components and sensors due to the potential presences of LNGs in the stormwater runoff. Pumps were engineered with 7.5 hp Ebara pumps in a duplex configuration, and a UL listed control panel was supplied with added cable lengths for installation outside of NFPA classified spaces near the pump station.