This lift station was designed to meet the low sewage flow requirements of a municipal lift station that would also serve new construction and commercial buildings. Submersible cutter pumps in a duplex configuration and an inlet-line drop bowl provide reliable pumping capabilities, and a separate below-grade valve assembly holds the system valves. A sheltered alternator panel with a basic alarm manages the mechanical and electrical system controls. Liquid level-sensing is managed by float controls wired for intrinsically safe.
City of Lemoore|City of Lemoore, CA| 311 GPM - 16.5' TDH
Romtec Utilities designed, supplied, and installed a wastewater lift station for a new housing development in Lemoore, California. The lift station connects to the city sewer with medium flows of wastewater to treatment.
Stormwater Lift Station in Norco, CA
Halifax Regional Water Commission|Bedford, NS| 220 GPM - 45.4' TDH
Romtec Utilities was contacted to replace two aging wastewater lift stations with a modern system capable of handling their combined flow in Bedford Nova Scotia in Canada.
Clark County Water Reclamation District | Las Vegas, NV | 70 GPM - 47' TDH
Romtec Utilities designed and supplied a wastewater lift station for a housing development in Las Vegas, Nevada. Romtec Utilities worked with the developer, Summit Club Nevada, and the local water authority, Clark County Water Reclamation District (CCWRD), to design the system according to their design requirements.





