Sebastopol California

Burbank Housing|Sebastopol, CA|36 GPM - 26.8' TDH

jweddell5gpm - 50gpm, Municipal Collection, Pacific, Residential Development, Sewer System Expansion, Urban Growth, Wastewater

This wastewater lift station was required to hand medium sewage flows from a development neighborhood by Smith River Rancheria, the governing body of the Tolowa Dee-ni’ Tribe. Two Goulds Water Technology 2 hp grinder pumps were used to meet the high head requirements for over 3,000 ft of force main. A owner-supplied control building contains the control panel and an permanent onsite Cummins generator for backup power. A Mercoid pressure transducer provides primary level-sensing controls with Dwyer floats for backup.

The Great Seal of the Smith River Rancheria

Smith River Rancheria|Smith River, CA|60 GPM - 132' TDH

jweddell50gpm - 100gpm, Pacific, Residential Development, Wastewater

This wastewater lift station was required to hand medium sewage flows from a development neighborhood by Smith River Rancheria, the governing body of the Tolowa Dee-ni’ Tribe. Two Goulds Water Technology 2 hp grinder pumps were used to meet the high head requirements for over 3,000 ft of force main. A owner-supplied control building contains the control panel and an permanent onsite Cummins generator for backup power. A Mercoid pressure transducer provides primary level-sensing controls with Dwyer floats for backup.

City of Battle Ground|Battle Ground, WA|80 GPM - 28' TDH

jweddell50gpm - 100gpm, Pacific, Schools, Wastewater

When a public high school decommissioned an existing septic system, a replacement package lift station was needed to handle the sewage from the campus. Tsurumi submersible cutter pumps were used to pass most solids and cut larger solids into passable sizes (about 1¼” diameter). The pumps also meet the low flow low head requirements for the new 3” PVC force main. The manhole and below grade valve vault are traffic rated. The outdoor control panel was mounted on the existing support structure for the decommissioned septic.

Vega Meadows Road Development

Lennar Communities|Bakersfield, CA|297 GPM - 57' TDH

jweddell100gpm - 300gpm, Municipal Collection, Pacific, Residential Development, Sewer System Expansion, Wastewater

This package wastewater lift station handles sewage flows from this large residential development neighborhood. Duplex submersible solids handling pumps pump a high flow rate from this 30’ deep wet well. The wet well includes an interior fiberglass lining and exterior coating. A below grade valve vault provides easy access to the valves, ports, and gauges. For level controls, the outdoor control panel includes a pressure transducer and floats for backup. An autodialer and backup generator are also included in the panel design and supply.

County of Del Norte

Del Norte County | Eureka, CA | 220 GPM - 36' TDH

jweddell100gpm - 300gpm, Municipal Collection, Now & Future Expansions, Pacific, Sewer System Expansion, Wastewater

To extend the sewer system for Crescent City in Del Norte County, this sewage lift station was added to a new gravity line and force main. Duplex submersible chopper pumps pump the sewage to an existing gravity line and on to treatment. An easy-to-access below grade valve assembly contains the check and plug valves. An outdoor PLC panel is connected to a customer-supplied generator and is also protected by a customer-supplied shelter. Primary liquid level sensing is by a pressure transducer with floats as a backup.