The Portside Phase 3 project was part of a new industrial development by Specht Development. Located in Vancouver, Washington, this industrial development was in need of a wastewater lift station and Perlo Construction, the awarded general contractor, brought this opportunity to Romtec Utilities.
Grain Millers, Inc.|Junction City, OR| 70 GPM - 38' TDH
Romtec Utilities was contacted to design and supply a wastewater lift station for the newly constructed Northern Gold Foods manufacturing facility in Junction City, Oregon. The new system handles wastewater from both sewer lines and process water from the food manufacturing process.
Orlando Utility Commission|Orlando, FL| 100, 800 GPM - 85.6', 135' TDH
Romtec Utilities was hired to design and supply pump stations to support a combined-cycle power generation process that requires significant amounts of recirculated water to function for the Orlando Utility Commission in Orlando, FL.
East Bay Municipal Utility District|Berkeley, CA|2,085 GPM - 118' TDH
Refurbishing a shut-down water treatment plant required a new pump station to pump high flows of water. The unique application drains water used in a cleaning process into a large settling pond.
Utica East Ohio Midstream LNG Plant|Kensington, OH|150 GPM - 59' TDH
Utica East Ohio Midstream needed a new pump stations to handle low flows of stormwater runoff at its new Kensington Plant in Ohio. To responsibly contain potentially hazardous stormwater from the topsoil, this pump station was designed with a double-wall fiberglass wet well with interstitial leak detection. The pumping system also included corrosion resistant components and sensors due to the potential presences of LNGs in the stormwater runoff. Pumps were engineered with 7.5 hp Ebara pumps in a duplex configuration, and a UL listed control panel was supplied with added cable lengths for installation outside of NFPA classified spaces near the pump station.