Santa Barbara County needed this package lift station to replace an existing system serving a residential area next to Goleta Beach. Ebara submersible sewage pumps were engineered in a duplex configuration to alternate starts and create redundancy in the system. Liquid level-sensing also includes redundancy by using Dwyer floats as the primary control device and a Multitrode probe for high-level backup. A UL listed control panel uses a NEMA 4X stainless steel enclosure to be safely located outside of the existing control building.
City of Shafter|Shafter, CA| 414 GPM - 27.5' TDH
Romtec Utilities was contacted to design and supply a replacement wastewater lift station for the City of Shafter in Rodriguez Park. The new system was needed to handle growing flows from the area while modernizing the infrastructure.
Highgate Community|Bakersfield, CA | 450 GPM - 50 TDH
Romtec Utilities supplies its customers with the best systems for the customers’ needs; the Highgate Community project is a project that required more than just a basic system. This is a Wastewater pump station in Bakersfield, California, constructed to serve a new development by Castle and Cooke.
San Bernardino Municipal Water Department| San Bernardino, CA| 188 GPM - 20.4' TDH
The recent Washington Avenue Lift Station project in San Bernardino, California, began as a retrofit and ultimately ended as a full system replacement.
Old Highway 99 N | Roseburg, OR
Many projects are brought to us by either a municipality or a contractor that has been hired for the project by another agency. In the case of the Old Highway 99 project, R&G Excavating, the contractor hired by David Evans & Associates, brought the project to Romtec Utilities.