City of Laguna Beach

The City of Laguna Beach|Laguna Beach, CA|600 GPM - 77' TDH

jweddell500gpm - 1,000gpm, Collection Systems, Design and Engineering, Grinder Vault, Pacific, Replacements & Retrofits, Slurry/Gritty Water, Wastewater

This high flow wet/dry lift station replacement was installed “in the sand” of Main Beach with three dry pit pumps in a 26-feet-deep precast rectangular vault. Triplex split case pumps, sump pumps, an intake/exhaust fan, lights, valves, stairs, and a mezzanine were all provided in the package. The Allen Bradley PLC control panel, flow transmitter, and junction box are located in a control building. Sophisticated SCADA, 3 levels of redundancy, auxiliary power, and an HDPE wet well are all primary components of this package lift station.

Milan Federal Prison|Milan, MI|125 GPM - 22' TDH

jweddell100gpm - 300gpm, Central, Prisons/Detention Centers, Pumping Skids, Replacements & Retrofits, Retrofits, Wastewater

Two skid-mounted lift station systems retrofitted two existing stations for medium sewage flows at this federal correctional facility. Preassembled above-grade skids with Pioneer self-priming pumps in duplex configurations drop suction piping into the existing sumps to pump effluent to the existing force mains.