The new Bay 101 casino required 6 stormwater pump stations to handle low flows of stormwater in San Jose, California. Each pump station will help serve new hotels as this casino facility expands. These pump stations needed to meet the low flow requirements while maintaining consistent head conditions.
United States Postal Service|Portland, OR|100 GPM - 29.7' TDH
A new distribution center for the United States Postal Service in Portland, Oregon required a wastewater lift station. The lift station handles both wastewater and stormwater flows because the stormwater that is collected onsite is essentially wastewater due to fuel and other contaminants from a truck loading area.
Westfield Valley Fair Mall|Santa Clara, CA|31 GPM - 10.7' TDH
The revitalization of a large mall in Santa Clara, CA required a new pump station to handle low flows of stormwater runoff from a section of the parking lot. This system utilized an economic design with a 4-foot ID precast concrete wet well, schedule 80 PVC discharge piping, and small ½ hp Weil pumps in a duplex configuration.
Doheny Village Stormwater|Dana Point, CA|50 GPM - 14' TDH
City improvements for the Doheny Village in Dana Point, California required a new stormwater pump station for the residential revitalization. To meet the required flows, the new pump station utilized a 1/3 hp Goulds submersible pump in a simplex configuration.
Pomona College | Claremont, CA | 370 GPM - 14.5' TDH
Pomona College in Claremont, California needed this new stormwater pump station to handle a wide flow range of runoff.