The Romtec Utilities pump station is just the newest addition to the clean-up efforts, which began in 1981 at the NIROP site.
Bridge Development Partners | 50 GPM - 15.3' TDH
For their new development, the location was in need of a Romtec Utilities stormwater lift station to collect runoff water from the building and parking lot areas.
Broadway Business Park | 50 GPM - 25.4' TDH
In the Broadway Business Park Project, Romtec Utilities supplied a stormwater pump station for a new development by Ninety/Fifty LLC.
Industrial Crating and Packing|Tukwila, WA| 512 GPM - 29.1' TDH
Woodburn Development LLC, with ICON Construction and Development, Emerio Design, and Canby Excavations were in need of a wastewater lift station for a new development. The Romtec supplied waste water wet well is a precast 10’ inner diameter (ID) well that is 36’ in depth.
Port of Tacoma|Tacoma, WA | 1090-1430 GPM - 25.6'-31.6' TDH
The Port of Tacoma required three pump stations to send untreated stormwater through onsite water treatment systems. All stormwater that enters the marina will first travel through one of these three systems before being treated to improve the water quality at the port.





