U.S. Army Base|Kalaheo, HI|74 GPM - 85' TDH

jweddell50gpm - 100gpm, Military Installations, Mixed Use, Wastewater, Wastewater Featured

Serving the US Army Base, Fort Shafter, this military neighborhood needed a lift station replacement package to be installed adjacent to the existing lift station. The Army and Romtec Utilities configured this submersible centrifugal pump station to pump the medium flow of municipal wastewater. The outdoor control panel utilizes conductive probes for primary and backup level controls and an autodialer for communications. A new generator was installed at grade above an existing generator pit. The owner supplied shelters for the panel and onsite generator.

Clark County, Washington|Vancouver, WA|325 GPM - 48' TDH

jweddell300gpm - 500gpm, Municipal Collection, Pacific, Sewer System Expansion, Wastewater

This lift station was designed to meet the medium sewage flow requirements of a municipal lift station. The duplex pump configuration and backup level sensing provide suitable redundancy for a reliable and long-term wastewater lift station. Solids-handling pumps designed for wastewater were supplied to eliminate clogging concerns. A sheltered outdoor PLC control panel provides robust and programmable lift station controls. This lift station also includes a permanent on-site generator to guarantee continued system operation.