The Line at Santa Ana is a new mixed-use infill development that will add 228 new apartments and 4,000 square feet of commercial space across several buildings. Romtec Utilities was hired to provide two engineered pumping systems that would discharge treated stormwater into the storm sewer.
Santa Ana Delhi | Orange County, CA
This project is a new lift station handling low flows in the Santa Ana Delhi Channel in Newport Beach, California. This system collects stormwater in a 10’ inner diameter (ID) wet well that reaches 32’ in depth. In the bottom of the well, three Ebara 20 horsepower (HP) submersible pumps sit ready to pump out the water.
City of Santa Paula | Santa Paula, CA
Romtec Utilities often supplies lift stations for new developments. In the Harvest at Limoneira project, a new residential development in Santa Paula, California, was in need of a wastewater lift station with a large wet well.
1025 Sweetwater Road|Spring Valley, CA| 200 GPM - 12.4' TDH
NLA Spring Valley LLC was constructing a commercial development and in need of a stormwater lift station. This Romtec Utilities stormwater pump system was needed for small and 100-year storm events for a commercial development.
Ontario Christian Highschool|Ontario, CA| 226 GPM - 23.8' TDH
In Ontario, California, the Ontario Christian High School was undergoing renovations. The General Contractor (GC) CCI was building a new, state of the art building that would be a dual student center and athletic facility. This new addition to the high school would provide a new gymnasium, weight and training rooms, softball fields, and new parking lots with bus loading areas and plentiful parking.





