The Orange County Water District needed to replace a wastewater lift station for the Burris Basin Pump Station in Anaheim, California. Burris Basin is a large groundwater pump station, pumping clean groundwater to 19 water districts in Southern California.
City of Bakersfield | Bakersfield, CA | 825 GPM - 26.1' TDH
A residential neighborhood in Bakersfield, California needed to upgrade an existing Romtec Utilities lift station to keep up with increasing sewer flows. To meet the higher flow requirements, Romtec Utilities upgraded the existing 7.5 hp pumps to 12 HP Flygt submersible pumps in a duplex configuration.
Bay 101|San Jose, CA|31-187 GPM - 10.2'-20.6' TDH
The new Bay 101 casino required 6 stormwater pump stations to handle low flows of stormwater in San Jose, California. Each pump station will help serve new hotels as this casino facility expands. These pump stations needed to meet the low flow requirements while maintaining consistent head conditions.
United States Postal Service|Portland, OR|100 GPM - 29.7' TDH
A new distribution center for the United States Postal Service in Portland, Oregon required a wastewater lift station. The lift station handles both wastewater and stormwater flows because the stormwater that is collected onsite is essentially wastewater due to fuel and other contaminants from a truck loading area.
University of California Merced|Fresno, CA|720 GPM - 48.9' TDH
The University of California, Merced needed a new wastewater lift station for the expansion of its campus. Two 20 hp Vaughan chopper pumps were included to meet the high flow requirements.