Woodburn Development LLC, with ICON Construction and Development, Emerio Design, and Canby Excavations were in need of a wastewater lift station for a new development. The Romtec supplied waste water wet well is a precast 10’ inner diameter (ID) well that is 36’ in depth.
Highgate Community|Bakersfield, CA | 450 GPM - 50 TDH
Romtec Utilities supplies its customers with the best systems for the customers’ needs; the Highgate Community project is a project that required more than just a basic system. This is a Wastewater pump station in Bakersfield, California, constructed to serve a new development by Castle and Cooke.
Mitsubishi Gas Chemical|Forest Grove, OR | 475 GPM - 19.7' TDH
The construction of a hydrogen peroxide refinement plant for the Mitsubishi Gas Chemical Company (MGC) required a pump station to collect and discharge stormwater to an onsite treatment system.
City of Shafter|Shafter, CA| 414 GPM - 27.5' TDH
Romtec Utilities was contacted to design and supply a replacement wastewater lift station for the City of Shafter in Rodriguez Park. The new system was needed to handle growing flows from the area while modernizing the infrastructure.
City of Lemoore|City of Lemoore, CA| 311 GPM - 16.5' TDH
Romtec Utilities designed, supplied, and installed a wastewater lift station for a new housing development in Lemoore, California. The lift station connects to the city sewer with medium flows of wastewater to treatment.