Romtec Utilities was contacted by Texas Water Engineers (TXWE) who was the utilities engineer on the project regarding pump selection for the private development.
NAVFAC | Fridley, MN | 1000 GPM - 35' TDH
The Romtec Utilities pump station is just the newest addition to the clean-up efforts, which began in 1981 at the NIROP site.
Crystal Creek Developers, LLC|Alvin, TX|500 GPM - 26' TDH
A new mixed-use community development needed a stormwater pump station to handle medium flows of stormwater from the community.
Boardwalk Pipeline Partners|Houston, TX|100 GPM - 11' TDH
The City of Los Angeles needed to construct a new 54” force main to increase sewer capacity and add redundancy to an existing 48” force main at Marina del Rey.
Marathon Petroleum|Robinson, IL|75 GPM - 125' TDH
The Marathon Petroleum Refinery in Robinson, IL needed this new industrial process water pump station to handle its medium flows of highly acidic water combined with standard wastewater. A precast concrete sump included an interior Tnemec coating to withstand the water chemistry from a refinery testing lab. 11 hp Goulds grinder pumps were designed in a duplex configuration and included a factory epoxy coating to withstand the water chemistry. The pump station piping was designed with stainless steel components, and corrosion resistant floats were included as the liquid level sensing devices.





