Romtec Utilities designed, engineered, and manufactured a package wastewater lift station for a new housing development in Ridgefield, Washington.
City of Los Angeles|Marina del Rey, CA|200 GPM - 15' TDH
The City of Los Angeles needed to construct a new 54” force main to increase sewer capacity and add redundancy to an existing 48” force main at Marina del Rey.
Manchester|Port Orchard, WA|195-265 GPM - 21'-37' TDH
Romtec Utilities provided 3 wastewater lift stations for Manchester Residential Area outside of Seattle, WA.
Clear Creek Tahoe|Carson City, NV|99 - 165 GPM - 224.7' - 267' TDH
The new residential development at Clear Creek Tahoe needed two new wastewater lift stations. The location of the development has many elevation changes and to successfully pump the sewage off to treatment, two lift stations were necessary.
City of Shafter|Shafter, CA|350 GPM - 19.6' TDH
The City of Shafter in California needed a new sewer lift station to replace an existing system with out-of-date components.