Wisconsin Paint Hangar Lift Station

Romtec Utilities partnered with Brown & Caldwell to design and deliver a paint wastewater lift station at an aviation facility in Wisconsin.

Hannah Duncan100gpm - 300gpm, Airports, Classified Water Conditions, Corrosive/ Caustic Pumping, Process Water, Slurry/Gritty Water, Wastewater

Wisconsin - Paint Wastewater Lift Station Project Assets DESIGN DRAWINGS Romtec Utilities partnered with Brown & Caldwell to design and deliver a specialized paint wastewater lift station at an aircraft hangar at a regional aviation facility in Wisconsin. This lift station was engineered to move wastewater created during painting and maintenance work. Unlike standard sanitary wastewater, paint wastewater can contain chemicals, cleaning agents, paint residue, solvents, and solids up to 2 inches in size. These ...

Romtec Utilities designed and supplied a leachate lift station for the Keystone Sanitary Landfill in Dunmore, Pennsylvania

Hannah Duncan500gpm - 1,000gpm, Corrosive/ Caustic Pumping, Eastern, Landfills & Leachate, Wastewater

Dunmore, Pennsylvania - Leachate Lift Station Project Assets DESIGN DRAWINGS PANEL DESIGN SITE-PLANS Romtec Utilities designed and supplied a leachate lift station for the Keystone Sanitary Landfill in Dunmore, Pennsylvania. This system helps manage leachate, a type of wastewater that forms when rainwater filters through landfill waste. The project was created to meet updated rules from the Pennsylvania Department of Environmental Protection, with a strict completion deadline of April 2025. Romtec Utilities’ solution included a ...
City of Shafter in California

The City of Shafter|Shafter, CA|400 GPM - 28.5' TDH

Hannah Duncan100gpm - 300gpm, 300gpm - 500gpm, 500gpm - 1,000gpm, Pacific, Replacements & Retrofits, Wastewater

A suburb of the City of Shafter required a lift station package to repair and rehabilitate an existing wastewater sump. Duplex submersible centrifugal pumps and discharge pipe mounting brackets were fitted to a concrete slab poured in the bottom of the existing manhole. The Romtec Utilities package included the proper components to operate in this 26-foot-deep sump. An outdoor MultiSmart control panel utilizes conductive probes for primary and backup level controls and an autodialer for communications. This retrofit package saved about 60% the cost of a new lift station.