Pleasant Valley RV Park

Pleasant Valley RV Park|Williston, ND|844 GPM - 38' TDH

jweddell500gpm - 1,000gpm, Central, Mixed Use Development, Resorts/ Golf Courses, Wastewater

A residential boom town of employees from nearby natural gas mining facilities needed a large lift station to handle over 1.2 MGD of wastewater. Submersible Ebara sewage pumps in a triplex configuration were included for the new and future pumping rates resulting from residential growth. The lift station controls are located in a nearby control building. The UL listed control panel utilizes floats for primary and backup level controls, an autodialer for communications, and a permanent onsite generator for backup power.

Industrial Plant with Pumping System

Ajax Natural Gas Plant|Wheeler, TX|200 GPM - 50' TDH

jweddell100gpm - 300gpm, Bid Packages, Central, Featured Projects, First Flush, Industrial, Industrial Process Water featured, Industrial Water, Oil & Gas, Oil/Water Separators, Stormwater Runoff, Tech Info

This package pump station was designed to meet a low flow of industrial process water with added low flows of industrial stormwater. The dual purposes of this pump station required shaft-driven centrifugal pumps with the motors located above-grade.