Romtec Utilities worked on the replacement of a lift station needed for the 4 separate new facilities which will feed into this lift station.
Stormwater Pump Station Upgrade - City of Los Angeles
The owner of this project was upgrading an existing Waste Management facility with a large stormwater pump station.
Wastewater Pump Station Upgrade - City of Los Angeles
This project involves upgrading an existing waste management facility which has a large stormwater and smaller wastewater pump station.
San Bernardino Municipal Water Department| San Bernardino, CA| 188 GPM - 20.4' TDH
The recent Washington Avenue Lift Station project in San Bernardino, California, began as a retrofit and ultimately ended as a full system replacement.
The City of Laguna Beach|Laguna Beach, CA|600 GPM - 77' TDH
This high flow wet/dry lift station replacement was installed “in the sand” of Main Beach with three dry pit pumps in a 26-feet-deep precast rectangular vault. Triplex split case pumps, sump pumps, an intake/exhaust fan, lights, valves, stairs, and a mezzanine were all provided in the package. The Allen Bradley PLC control panel, flow transmitter, and junction box are located in a control building. Sophisticated SCADA, 3 levels of redundancy, auxiliary power, and an HDPE wet well are all primary components of this package lift station.