This Mt. Solo lift station was for a new housing development by Hinton Development in Longview, Washington.
Phased Lift Station | Ridgefield, WA | 350 GPM - 50.6' TDH
Romtec Utilities worked with Rotschy, Inc. to supply a phased lift station for the Seton Pump Station project.
Microsoft | Silicon Valley, CA | 400 GPM - 20.5' TDH
Romtec Utilities supplied both the stormwater and the wastewater systems to achieve the “net-zero” usage goals on the project.
Georgia Transmission Corporation|Forsyth, GA| 55 GPM - 49' TDH
Romtec Utilities was contacted to design and supply a wastewater lift station to replace an aging septic sewer systems for the Georgia Transmission Corporation’s (GTC) Electric Cooperative Training Center in Georgia.
Culbertson Power Plant|Culbertson, CA|100 GPM - 25' TDH
This power generation facility installed a package lift station designed for medium sewage flows of industrial wastewater. To protect the submersible solids-handling pumps, an inlet line deflector panel was included in the design. The wet well was protected from off-gassing and corrosion by an interlocking fiberglass lining. Conductive probes are used for primary and backup liquid level-sensing with an outdoor UL listed control panel. The panel is outfitted with a basic alarm and an autodialer for telecommunications.