City of Los Angeles|Marina del Rey, CA|200 GPM - 15' TDH
The City of Los Angeles needed to construct a new 54” force main to increase sewer capacity and add redundancy to an existing 48” force main at Marina del Rey.
Port of Portland|Portland, OR|18,140 GPM - 10.62' TDH
The Portland International Airport (PDX) needed a very large pump station to discharge high volumes of stormwater to a runoff creek from one of its runways.
Kings Mountain Energy Center|Kings Mountain, NC|480 GPM - 35' TDH
A new HRSG system required 3 industrial pump stations to provide water for its processes. This HRSG blowdown pump station needed to handle extreme pumping conditions.
Manchester|Port Orchard, WA|195-265 GPM - 21'-37' TDH
Romtec Utilities provided 3 wastewater lift stations for Manchester Residential Area outside of Seattle, WA.