Development

Recent Projects

City of Port Orchard Logo
City of Port Orchard | Residential Wastewater Lift Station
154 GPM | 93.5′ TDH

Romtec Utilities was contacted by GFK Consulting, Inc., who are very familiar with us from previous projects. We worked with Contour Engineering LLC in the development of the 30% design package. This wastewater lift station has Vaughan submersible pumps and Allen-Bradley CompactLogix as the primary controller.

City of Norco Logo
City of Norco, CA | Stormwater Lift Station
2000 GPM | 16.9′ TDH

This stormwater lift station project is for a new business park being developed by Caprock Partners in Norco, California. The site has needs for a detention basin to contain storm events and a pump station to empty the basin into the public stormwater system. It will sit in the berm/access road of the detention basin.

lakewood nj
Township of Lakewood | Residential Development Wastewater Lift Station
100 GPM | 41.1′ TDH

Romtec Utilities was proud to be part of this wastewater lift station in Lakewood, New Jersey for the developer and the various players as we designed and supplied the entire lift system. The lift system features a duplex configuration of 5hp Ebara submersible pumps and an FMX21 pressure transducer.

Development

City of Portland, Oregon seal
City of Portland | Wastewater Pump Station
51 GPM | 18.0′ TDH

The Halsey 28 apartments needed a new wastewater pump station as part of the project which Romtec Utilities designed and supplied. Westech brought Romtec Utilities this new project with a very quick turnaround.

Capitol Heights Logo
Town of Capital Heights, MD | Stormwater Pumping System
10,916 GPM | 20.3′ TDH

This mixed-use development needed a stormwater pump station to handle flooding at a combination residential/commercial site. This pump station saves the site in the event of flooding.

City of ridgefield logo
City of Ridgefield, WA | Wastewater Pumping System
58 GPM | 60.9′ TDH

This project was brought to us by SGA Engineering. Clark Regional Wastewater District is the end owner of this pump station and has signed off on using the “interim” standard lift station which will not need to be designed to meet the full municipal requirement.

Jacobsen Development Group Logo
Jacobsen Development Group | Residential Stormwater Lift Station
320, 280 GPM | 23.7, 24.5′ TDH

Romtec Utilities provided two stormwater pump stations for the Torrance Memory Care Housing unit in Torrance, California. Jacobsen Development Group are the owners who developed the Torrance Memory Care housing project.

City of Troutdale
City of Troutdale | Residential Wastewater Lift Station
57 GPM | 30.9′ TDH

The Sheldon Development project needed a wastewater lift station for the private apartment complex that requires a privately owned and maintained pump station to serve the sewer for the site.

City of Port Orchard Logo
City of Port Orchard | Residential Wastewater Pump Station
88 GPM | 172.9′ TDH

Haven Apartments is a new apartment complex with 250 units in Port Orchard. As part of the new apartment complex, the development needed a residential wastewater pump station.

Madera Logo
City of Madera, CA | Wastewater Lift Station
550 GPM | 25′ TDH

The Valley Knolls Development in Carson City, Nevada required a new wastewater station to service the new housing development.

Clark Regional 400X400
Clark Regional Wastewater District | Ridgefield, WA – Phased Lift Station
350 GPM | 50.6′ TDH

Romtec Utilities worked with Rotschy, Inc. to supply a phased lift station for the Seton Pump Station project.

Douglas County Nevada
Valley Knolls | Carson City, NV
117 GPM | 105′ TDH

The Valley Knolls Development in Carson City, Nevada required a new wastewater station to service the new housing development.

scappoose-oregon-logo-ru
City of Scappoose, OR | Wastewater Package Pump Station
426 GPM | 67.8′ TDH

Romtec Utilities worked with Cardno as they were the project driver. RU designed and supplied the lift station to fit the needs of the large development.

City of Granbury Texas
City of Granbury, TX | Wastewater Package Pump Station
486 GPM | 29′ TDH

Romtec Utilities was contacted by Texas Water Engineers (TXWE) who was the utilities engineer on the project regarding pump selection for the private development.

City of Beaumont California
City of Beaumont | Wastewater Package Pump Station
467 GPM | 99.3′ TDH

The pump station was designed to the City of Beaumont’s standards which have adopted Eastern Municipal Water District requirements, as the city will also be the end owner of the system.

microsoft-logo
Microsoft Silicon Valley Campus | Lift Stations
400 GPM | 20.5′ TDH

Romtec Utilities supplied both the stormwater and the wastewater systems to achieve the “net-zero” usage goals on the project.

RCC-Logo
Rogue Community College | Potable Water Booster Station
1333 GPM | 177′ TDH

Romtec worked with Marquess & Associates to provide them with the best value from an engineering, construction, and overall cost of maintenance standpoint.

City of San Bernardino Water Department
San Bernardino Municipal Water Department | Wastewater Lift Station
188 GPM | 20.4′ TDH

The recent Washington Avenue Lift Station project in San Bernardino, California, began as a retrofit and ultimately ended as a full system replacement.

Trammell Crow Residential Logo
Trammell Crow Residential | Wastewater Lift Station
211 GPM | 23.6′ TDH

Romtec Utilities supplied a wastewater lift station to service a new apartment building by Trammell Crow Residential in San Diego, California.

West Sound Utility District Logo
West Sound Utility District | Wastewater Pump Station
280 GPM | 145.2′ TDH

Romtec Utilities worked with two different developers and the West Sound Utility District for the supply of a wastewater lift station.

Kitsap County Washington
Kitsap County | Wastewater Pump Station
146 GPM | 46.4′ TDH

Romtec Utilities supplied a wastewater pump station to serve a residential/townhome development by Norpoint Communities in Kitsap County, Washington.

los-angeles-county-seal-vector-891531
Hancock Parkway Properties | Stormwater Lift Station
450 GPM | 15.8′ TDH

The site of the new development is close to the Santa Clara River, driving the need for all the stormwater runoff to be collected and treated in order to keep contaminated water from making its way into the Santa Clara.

Bridge Development Partners
Bridge Development Partners | Stormwater Lift Station
50 GPM | 15.3′ TDH

For their new development, the location was in need of a Romtec Utilities stormwater lift station to collect runoff water from the building and parking lot areas.

Gulf South Pipeline
Gulf South Pipeline Company | Stormwater Pump Station
50 GPM | 15.1′ TDH

The Westlake Compressor Stormwater Pump Station in Louisiana is just one of three recent Romtec Utilities projects for the Gulf South Pipeline Company, also known as the Boardwalk Pipeline partners.

Yocha Dehe Wintun Nation
Yocha Dehe Wintun Nation | Wastewater Pump Station
206 GPM | 142.9′ TDH

The Mossy Creek project is a wastewater lift station for a new development to support the Cache Creek Casino Resort.

Earthworks
Broadway Business Park | Stormwater Pump Station
50 GPM | 25.4′ TDH

In the Broadway Business Park Project, Romtec Utilities supplied a stormwater pump station for a new development by Ninety/Fifty LLC.

City of North Bend Logo
City of North Bend Sewer District | Wastewater Pump Station
320 GPM | 51.0′ TDH

Quadrant Homes selected Romtec Utilities to design and supply a wastewater lift station that would satisfy the both the design criteria of the district and the needs of the development.

Net Lease Alliance 1
Net Lease Alliance | Stormwater Lift Station
200 GPM | 12.4′ TDH

NLA Spring Valley LLC was constructing a commercial development and in need of a stormwater lift station. This Romtec Utilities stormwater pump system was needed for small and 100-year storm events for a commercial development.

City of Santa Paula California
City of Santa Paula | Large Wastewater Wet Well
740 GPM | 59.4′ TDH

Romtec Utilities often supplies lift stations for new developments. In the Harvest at Limoneira project, a new residential development in Santa Paula, California, was in need of a wastewater lift station with a large wet well.

bakersfield
City of Bakersfield | Wastewater Lift Station
450 GPM | 50′ TDH

Romtec Utilities supplies its customers with the best systems for the customers’ needs; the Highgate Community project is a project that required more than just a basic system. This is a Wastewater pump station in Bakersfield, California, constructed to serve a new development by Castle and Cooke.

City of Port Orchard Washington
City of Port Orchard | Replacing Old Lift Stations with Efficient Designs
3800 GPM | 142′ TDH

The McCormick Lift Station #1 is an impressive site; on site are a 10’ inner diameter (ID) wet well, a precast rectangular dry pit, a fiberglass storage tank, a meter vault, a davit crane, a backup generator, and a control building to house the NEMA 12MCC controls and the Allen-Bradley CompactLogix controller.

lcg-400x400
Laguna Canyon Group | Stormwater Pump Station with On-Site Water Treatment
14 GPM | 22′ TDH

The development of multiple retail outlets in San Clemente, California required the installation of a stormwater pump station. The system needed to work with the specifications of another pumping system by discharging collected stormwater through an on-site biofiltration treatment system.

Northshore Utility District
Northshore Utility District | Wet-Dry Lift Station for Residential Development
153 GPM | 130′ TDH

Romtec Utilities was contacted to provide the design and supply of a sewer lift station to connect 12 newly constructed homes in the Seattle metropolitan area.

Grain Millers Wastewater and Process Fluid
Grain Millers, Inc. | Wastewater & Process Fluid Lift Station in Food Production Facility
70 GPM | 38′ TDH

Romtec Utilities was contacted to design and supply a wastewater lift station for the newly constructed Northern Gold Foods manufacturing facility in Junction City, Oregon. The new system handles wastewater from both sewer lines and process water from the food manufacturing process.

Clark County Water Reclamation District
Clark County Water Reclamation District | Wastewater & H2S Capable Lift Station
70 GPM | 47′ TDH

Romtec Utilities designed and supplied a wastewater lift station for a housing development in Las Vegas, Nevada. Romtec Utilities worked with the developer, Summit Club Nevada, and the local water authority, Clark County Water Reclamation District (CCWRD), to design the system according to their design requirements.

City of Shafter in California
City of Shafter | Replacement Wastewater Lift Station in City Park
414 GPM | 27.5′ TDH

Romtec Utilities was contacted to design and supply a replacement wastewater lift station for the City of Shafter in Rodriguez Park. The new system was needed to handle growing flows from the area while modernizing the infrastructure.

United Natural Foods
United Natural Foods Inc. | Combined Private and Public Sewer Lift Station
187 GPM | 32.8′ TDH

Romtec Utilities was hired to design and supply a wastewater lift station to expand the sewer infrastructure in Ridgefield, WA. The lift station was for an expansion of a commercial distribution center for United Natural Foods, Inc. or UNFI.

City of Beaumont California
City of Beaumont | Wastewater Lift Station for Master Planned Community
505 GPM | 158′ TDH

Romtec Utilities designed, supplied, and manufactured a packaged wastewater lift station for a new planned community development in the City of Beaumont, California. This is a large system will meet the sewage flow requirements for 981 new homes getting constructed.

City of Vancouver Washington
City of Vancouver | Wastewater Packaged Pump Station
272 GPM | 161.3′ TDH

Romtec Utilities was contacted to provide a package wastewater lift station for Columbia Palisades, a mixed-use development in Vancouver, Washington. This large development project by Airpark Development will transform 84-acres of an old rock quarry into an urban neighborhood with residential units, commercial spaces, and offices.

City of Lemoore California
City of Lemoore | Turnkey Sewer Lift Station
311 GPM | 16.5′ TDH

Romtec Utilities designed, supplied, and installed a wastewater lift station for a new housing development in Lemoore, California. The lift station connects to the city sewer with medium flows of wastewater to treatment.

Clark Regional 400X400
Clark Regional Wastewater District | Wastewater Lift Station
392 GPM | 88.6′ TDH

Romtec Utilities was contacted to provide the design and supply of a wastewater lift station as a complete package for a new housing development in Vancouver, Washington. The location of the development required Romtec Utilities to adhere to the robust design standards of the Clark Regional Wastewater District (CRWWD) for new lift stations.

Town of Samoa Washington Fire Hydrant Booster Pump Station
Town of Samoa | Housing Development & Fire Hydrant Booster Pump Station
1000, 200-600 GPM | 150′ TDH

Romtec Utilities was contacted to provide a design service order for a new booster pump station and control building for a housing development in the Town of Samoa. This booster pump station was designed to meet the immediate and future flow requirements of the development as it continued to expand.

Southgate Water and Sanitation Districts
Southgate Water District | Booster Pump Station & Integrated Control Building
125 GPM | 75′ TDH

Romtec Utilities designed and supplied a booster pump station and an integrated control building for an upscale development. This booster system regulates water pressure for the newly constructed homes.

Kitsap County Washington
Kitsap County | Wastewater Packaged Pump Station
130 GPM | 61.4′ TDH

Romtec Utilities was hired to provide the design and supply of a wastewater lift station for Settlers Field, a new residential development in Bremerton, Washington, across the sound from Seattle.

bakersfield
Coffee & Downing | Retail Buildings Lift Station
130 GPM | 33.2′ TDH

A private commercial development required a new lift station to handle medium flows of wastewater from several new retail buildings, including multiple restaurants.

Clark Regional 400X400
Clark Regional Wastewater District | Wastewater Lift Station for Residential Development
258 GPM | 94.7′ TDH

Romtec Utilities designed and supplied a wastewater lift station for a new residential development in the City of Ridgefield, Washington. The development and lift station will be completed in phases to meet the growing flow rates of the service area.

Roseburg Urban Sanitary Authority
Roseburg Urban Sanitary Authority | Sewer Lift Station in Industrial Zone
197 GPM | 45.3′ TDH

Romtec Utilities was hired to design and supply a wastewater lift station for an industrial development in Roseburg, Oregon.

Official Town Seal of the City of Puyallup
City of Puyallup | Abandoned Lift Station Retrofit
362 GPM | 40.5′ TDH

A residential development project in 2008 needed a new lift station to handle medium flows of sewage from the houses. The development was put on hold, and in 2013, Romtec Utilities supplied equipment to make the lift station operational.

bakersfield
City of Bakersfield | Deep Sewer Lift Station
2200 GPM | 44.1′ TDH

A new residential development needed a deep well sewer lift station to handle high flows of municipal wastewater.

City of Stanwood
City of Stanwood | Fully Integrated Lift Station and Control Building
160 GPM | 44′ TDH

The Mineral Point housing development in the City of Stanwood, Washington required a wastewater lift station to convey sewage to treatment for newly constructed houses.

Peoples Self Help Housing
Mission Garden | Affordable Housing Development Lift Station
100 GPM | 29.6′ TDH

Romtec Utilities provided the design and supply of this wastewater lift station, including all structural and mechanical systems for a new affordable housing development called Mission Garden.

Sammamish Plateau Water
Sammamish Plateau Water & Sewer District | Wastewater Lift Station
110 GPM | 66.5′ TDH

Romtec Utilities worked with SPWSD on a similar project to develop a new submersible lift station design standard that changed from its previous wet/dry configuration pump systems.

City of Shafter in California
City of Shafter | Multi-Phase Residential Development
500, 1000 GPM | 27.7′, 56.8′ TDH

Gossamer Grove is the largest housing development in the City of Shafter. Romtec Utilities provided the wastewater lift station for this development after establishing a standard lift station configuration with the City on previous projects.

Clark Regional 400X400
Clark Regional Wastewater District | Residential Development Sewer Lift Station
330 GPM | 118′ TDH

Romtec Utilities designed, engineered, and manufactured a package wastewater lift station for a new housing development in Ridgefield, Washington.

Long Beach Exchange Retail
Long Beach Exchange Retail | Five Identical Stormwater Pump Stations
150 GPM | 15.9′ – 18.7′ TDH

Romtec Utilities designed and supplied five stormwater pump stations for a new commercial development in Long Beach, California.

Douglas County Nevada
Douglas County Nevada | Residential Development
99 – 165 GPM | 224.7′ – 267′ TDH

The new residential development at Clear Creek Tahoe needed two new wastewater lift stations. The location of the development has many elevation changes and to successfully pump the sewage off to treatment, two lift stations were necessary.

Bay 101 Casino Logo
Bay 101 | Six Low-Flow Stormwater Pump Stations
31-187 GPM | 10.2′-20.6′ TDH

The new Bay 101 casino required 6 stormwater pump stations to handle low flows of stormwater in San Jose, California. Each pump station will help serve new hotels as this casino facility expands. These pump stations needed to meet the low flow requirements while maintaining consistent head conditions.

United States Postal Service Logo
United States Postal Service | Wastewater & Stormwater Collection Lift Station
100 GPM | 29.7′ TDH

A new distribution center for the United States Postal Service in Portland, Oregon required a wastewater lift station. The lift station handles both wastewater and stormwater flows because the stormwater that is collected onsite is essentially wastewater due to fuel and other contaminants from a truck loading area.

cedar-point-sports
Cedar Point Sports Center | Lift Station Pumping into Pressure Sewer
75 GPM | 60′ TDH

Romtec Utilities provided a complete wastewater lift station for a sports park in Ohio. This lift station collects wastewater from the on-site facilities and then pumps into an existing force main.

Logo for the Bureau of Reclamation
Bureau of Reclamation | Groundwater Recharge Basin
90 GPM | 20.0′ TDH

The Bureau of Reclamation needed a new wastewater lift station to handle medium flows of wastewater in Klamath Falls, Oregon. This pumping system includes 2 hp Ebara submersible pumps engineered in a duplex configuration to meet the anticipated sewage flow and provide redundancy.

Westfield-Valley-Fair-LOGO
Westfield Valley Fair Mall | Parking Lot Stormwater Runoff Pump Station
31 GPM | 10.7′ TDH

The revitalization of a large mall in Santa Clara, CA required a new pump station to handle low flows of stormwater runoff from a section of the parking lot. This system utilized an economic design with a 4-foot ID precast concrete wet well, schedule 80 PVC discharge piping, and small ½ hp Weil pumps in a duplex configuration.

Clark Regional 400X400
Clark Regional Wastewater District | Municipal Wastewater Lift Station Standard
350 GPM | 116′ TDH

A new residential development in Ridgefield, Washington needed a wastewater lift station to handle medium flows of sewage from the new houses. 23 hp Flygt submersible pumps were engineered in a duplex configuration to meet the expected peak flow rates.

Eden Housing 400X400
Camphora Lift Station | Affordable Housing Apartment Complex
140 GPM | 137.6′ TDH

Romtec Utilities designed and supplied a wastewater lift station for an apartment complex in Soledad, California. This lift station pumps into an existing force main owned by the nearby Soledad Prison.

dana-point-california-400x400
Doheny Village | Duplex Wastewater Lift Station
120 GPM | 30.1′ TDH

The City of Dana Point, California wanted to improve the Doheny Village neighborhood as part of a revitalization effort. One improvement included a new wastewater lift station to handle medium sewage flows from a new condominium development.

McCormick-Woods-Golf-Course
McCormick Woods | Golf Course Community Development Lift Station
100 GPM | 104.9′ TDH

In Port Orchard, Washington, new residential developments have been ongoing around the McCormick Woods Golf Course. The most recent development required a new lift station to handle medium flows of sewage for 200 new homes.

bakersfield
Manorwood Homes | Residential Development Lift Station Retrofit
200 GPM | 27.5′ TDH

A residential development that was put on hold during the recession of the housing market needed a lift station retrofit when the development was brought back to life.

norrisandstevens
River Ridge Apartments | Apartment Complex Booster Pump Station
270 GPM | 100′ TDH

A new apartment complex required a booster pump station for maintaining the water pressure of potable water for the apartments. The booster station used 5 hp Goulds stainless steel, multi-stage pumps in a triplex configuration.

City of Bremerton WA
City of Bremerton | Modern Residential Development
160 GPM | 118′ TDH

The City of Bremerton needed a new sewer lift station to handle medium flows of wastewater from a new residential development.

City of Snoqualmie
Snoqualmie Ridge Residential Development | Municipal Design Standards
115 GPM | 57.3′ TDH

A new housing development in the City of Snoqualmie needed this wastewater lift station to handle low sewage flows and meet the City’s design standards.

Indian-Springs-Resort
Indian Springs Resort | Geothermal Meter Vault

The Indian Springs Resort was required to add a geothermal flow meter vault to send its used spring water to treatment at the City of Calistoga.

Indian-Springs-Resort
Indian Springs Resort | Large Stormwater System
6800 GPM | 15.7′ TDH

The Indian Springs Resort needed a new pump station designed to handle high flows of stormwater runoff from a collection storm drain.

Indian-Springs-Resort
Indian Springs Resort | Wastewater Pumping
78 GPM | 11.6′ TDH

The Indian Springs Resort needed two new lift stations designed to pump medium flows of sanitary sewer and wastewater to municipal treatment.

Clark Regional 400X400
Clark Regional Wastewater District | Jessie Hollow Residential Development
124 GPM | 35′ TDH

Krippner Homes needed a new lift station to handle medium flows of sanitary sewer from a new residential development.

City of Guadalupe California
DJ Farms | Large Residential Development
135 GPM | 36.8′ TDH

This City of Guadalupe, California needed a new wastewater lift station to accommodate a residential development for up to 800 homes.

Huntington Beach 400X400
City of Huntington Beach | Industrial Center Stormwater Pumping
1800 GPM | 28.19′ TDH

A new 144,000 square feet, two building industrial center needed a large stormwater pump station to handle the runoff from the site. This triplex system includes a fourth, “jockey” pump to handle low flow dry-season runoff.

City of San Mateo Seal
City of San Mateo | Urban Housing Development Lift Station
1218 GPM | 96′ TDH

After the historic Bay Meadows racetrack closed down, a large residential development began that required this large wastewater lift station. A triplex configuration of 30 hp Flygt pumps handles the high flow rates of this system.

City of Port Orchard Washington
City of Port Orchard | Residential Development Wastewater Lift Station
200 GPM | 64′ TDH

The McCormick Woods northern development purchased this lift station configured to meet the medium flow requirements for municipal sewage. This package lift station was needed because of the uneven terrain surrounding the development.

Logo for the Pacific Convenience & Fuels
Pacific Convenience & Fuels | Grinder Pump Lift Station
15 GPM

The construction of a new gas station and convenience store required this low flow sewage lift station. Goulds submersible grinder pumps in a duplex configuration are designed to macerate and pump wastewater that contains solids or fabric materials without becoming clogged.

Elsinore Valley Municipal Water District
Elsinore Valley Municipal Water District | Oak Springs Ranch
262 GPM | 53.9′ TDH

This packaged lift station was designed to meet the medium flows of sewage from an upscale apartment development. The concrete wet well was precast with Ameron T-Lock lining to protect the concrete from hydrogen-sulfide off-gassing.

City of Kelso WA
City of Kelso | Submersible Wastewater Lift Station
308 GPM | 112′ TDH

A new development for a commercial park needed this wastewater lift station to connect the development to the municipal sewer system. Submersible centrifugal pumps in a duplex configuration were engineered to meet the medium flow high head conditions of the force main.

Granite City 400X400
Metro East Sanitary District | Municipal Sewer Lift Stations
123 GPM | 21′ TDH

A large neighborhood received these two lift stations that were designed to handle medium sewage flow requirements. The submersible solids-handling pumps in duplex configurations were specified to handle influent from three inlet lines from different sections of the neighborhood.

featured-north-college-marketplace
King Sooper’s Marketplace | Commercial Development Lift Station
150 GPM | 6.8′ TDH

The food & drug store serving a nearby university needed this replacement package wastewater lift station for medium flow rates. Submersible solids handling pumps are designed to operate with suspended grease in the water from a cafeteria in the market.

Tish-Non-Village
Bear River Band of Rohnerville Rancheria | Tribal Sewer Lift Station
70 GPM | 21.6′ TDH

The Bear River Band of Rohnerville Rancheria, a federally recognized tribe of the Mattole and Wiyot peoples, purchased this package wastewater lift station for a tribal community development.

Sebastopol California
City of Sebastopol | Municipal Wastewater Lift Station
36 GPM | 26.8′ TDH

This wastewater lift station was required to hand medium sewage flows from a development neighborhood by Smith River Rancheria, the governing body of the Tolowa Dee-ni’ Tribe.

The Great Seal of the Smith River Rancheria
Smith River Rancheria | Tribal Housing Wastewater Lift Station
60 GPM | 132′ TDH

This wastewater lift station was required to hand medium sewage flows from a development neighborhood by Smith River Rancheria, the governing body of the Tolowa Dee-ni’ Tribe.

Vega Meadows Road Development
Vega Meadows Road Development | Fiberglass Lined Lift Station
297 GPM | 57′ TDH

This package wastewater lift station handles sewage flows from this large residential development neighborhood. Duplex submersible solids handling pumps pump a high flow rate from this 30’ deep wet well.

City of Carpinteria CA
City of Carpinteria | Beachside Septic Replacement
87 GPM | 158.8′ TDH

An upscale beachside community in California needed this medium flow wastewater lift station to replace septic systems used at each home. To meet the requirements of the beachside location, this system includes Ameron T-Lock PVC lining on both a precast concrete sump and emergency overflow basin.

Coyote-Springs-Golf-Club
Coyote Springs | Housing Development Sewer Lift Station
121 GPM | 55′ TDH

This package lift station system was designed to meet the medium sewage flows of this new residential development and private golf course. Submersible solids handling pumps in a duplex configuration manage the influent for this deep well, and an above-grade valve assembly maintains proper discharge operations.

Goodwill Logo
Goodwill | Commercial Development Lift Station
50 GPM | 14.4′ TDH

A new commercial development where a Goodwill retail store was being built needed this robust wastewater lift station. The hatch and below-grade structural components of this lift station have an H-20 rating for occasional traffic so that the system could be located in the parking lot of the development.

featured-stevens-pass
Stevens Pass Ski Resort | Fast Lift Station Retrofit
65 GPM | 35′ TDH

Romtec Utilities designed and supplied this wastewater lift station retrofit to meet the medium sewage flows at the Steven’s Pass Ski Resort. A major part of the retrofit supply package were two Vaughan submersible chopper pumps for wastewater.

Lebanon-OR
Woods Trailer & RV Park | Low Flow, Low Head Lift Station Design
72 GPM | 28′ TDH

An RV park needed this package lift station to meet the municipal sewage requirements for the residents at the park. Pumping with low flow and low head conditions, the duplex Goulds submersible pumps are sized to efficiently fit the 14’ deep, 4’ diameter wet well.

Sammamish Plateau Water
Sammamish Plateau Water and Sewer District | Residential Development Lift Station
85 GPM | 75′ TDH

This medium flow sewage lift station was designed for a new development to meet the Sammamish Plateau Water and Sewer District lift station design standards. These standards specify a PLC controller with touchscreen HMI, SCADA options, a precast concrete valve vault, wet well, meter vault, and duplex submersible pumps.

City of Camas Washington
City of Camas | High Head Sewer Lift Station
126 GPM | 206′ TDH

In order to expand the municipal sewer system, this lift station was configured to pump to an existing gravity line flowing to treatment. A 24-foot-deep by 10-foot-diameter wet well collects the sewage flows.

City of Camas Washington
City of Camas, Washington | High Flow Lift Station at Residential Development
415 GPM | 117′ TDH

A large residential development required this package lift station to meet the high sewage flows for over 330 residential lots. Two inlet lines are fitted with deflector panels to reduce the in-well turbidity and protect the duplex submersible solids handling pumps from cascading influent.

Grand Ronde Tribal Housing Authority
Grand Ronde Tribal Housing Authority | Tribal Housing Lift Station
400 GPM | 30′ TDH

The Confederated Tribes of the Grande Ronde Community purchased this lift station to meet the medium sewage flows of a new housing development. Submersible solids handling pumps in a duplex configuration are protected from influent by two deflector panels on two inlet lines.

city-of-williston
Pleasant Valley RV Park | High-Capacity Triplex Lift Station
844 GPM | 38′ TDH

A residential boom town of employees from nearby natural gas mining facilities needed a large lift station to handle over 1.2 MGD of wastewater. Submersible Ebara sewage pumps in a triplex configuration were included for the new and future pumping rates resulting from residential growth.

kauai coffee
McBryde Resources | Continuous High Flow, High Head Pumping
9600 GPM | 415′ TDH

To create new potable water, this lift station pumps clean stormwater from a collection/storage basin to a treatment facility. Duplex vertical turbine pumps move high flows of water very efficiently and use soft starters to reduce torque on the vertical shaft and provide additional pump diagnostics.

Official Logo for Orange County Water Distrct
Orange County Groundwater Replenishment System | Collection Pump Station
4500 GPM | 32.5′ TDH

To create new potable water, this lift station pumps clean stormwater from a collection/storage basin to a treatment facility. Duplex vertical turbine pumps move high flows of water very efficiently and use soft starters to reduce torque on the vertical shaft and provide additional pump diagnostics.