IBM Resiliency Services|Boulder, CO|270 GPM - 36' TDH

jweddell100gpm - 300gpm, Data Centers, Mountain, Replacements & Retrofits, Wastewater

The IBM Boulder Data Center needed to replace a wastewater lift station with a new system to handle medium flows of wastewater generated at the facility. A precast concrete sump includes a pedestrian rated hatch with a safety grate for reliable fall protection. Two, Ebara 5 hp pumps were included in the design for redundant pumping capabilities, and a prefabricated valve vault structure contains check valves and control valves. A UL listed control panel with phase monitoring was engineered in a NEMA 4X stainless steel enclosure for installation outdoors.

Project Site of the Lakehurst Naval Air Station Wastewater Lift Station

Lakehurst Naval Air Station|Trenton, NJ|250 GPM - 24.77' TDH

jweddell100gpm - 300gpm, Bid Packages, Eastern, Featured Projects, Military Installations, Municipal Collection, Sewer System Expansion, Tech Info, Wastewater

This wastewater lift station was designed to meet the standards of the Lakehurst Naval Air Station while remaining cost effective. A duplex pump configuration utilized submersible 7.5 HP Weil Slicer Pumps to handle suspended solids in the sewage. A UL listed control panel was designed and manufactured in a NEMA 4 enclosure for outdoor operation. Nolta floats were used for the in-well liquid level sensing. The below-grade structural components were designed and supplied precast concrete vaults painted with a marine epoxy exterior coating to prevent moisture incursion.

City of Port Orchard Washington

City of Port Orchard|Port Orchard, WA|200 GPM - 64' TDH

jweddell100gpm - 300gpm, Pacific, Residential Development, Sewer System Expansion, Urban Growth, Wastewater

The McCormick Woods northern development purchased this lift station configured to meet the medium flow requirements for municipal sewage. This package lift station was needed because of the uneven terrain surrounding the development. Two submersible solids handling pumps pump to a below-grade valve assembly containing the lift station valves and access ports. A sheltered PLC control panel utilizes a pressure transducer for primary liquid level-sensing with backup float controls. The panel is tied to an onsite generator for emergency backup power.

Elsinore Valley Municipal Water District

Oak Springs Ranch | Wildomar, CA | 262 GPM - 53.9' TDH

jweddell100gpm - 300gpm, Apartment Complexes, Pacific, Residential Development, Wastewater

This packaged lift station was designed to meet the medium flows of sewage from an upscale apartment development. The concrete wet well was precast with Ameron T-Lock lining to protect the concrete from hydrogen-sulfide off-gassing. Ebara submersible sewage pumps in a duplex configuration provide redundant pumping capabilities suitable for the medium head conditions. This lift station also includes a bioxide odor control system in the design. A UL listed control panel provides the complete electrical controls with an autodialer for communications.