Romtec Utilities designed and supplied a stormwater pump station for the new Army Depot Park in Sacramento, California. The pump station was designed for the 10-year storm and is capable of pumping 930 gallons of stormwater per minute.
Trans Bay Cable|Pittsburg, CA | 500 GPM - 25' TDH
Romtec Utilities designed and supplied two stormwater pump stations for a converter station in the City of Pittsburg, California. The two systems are necessary to supply collected stormwater to an onsite water treatment system before being discharged into the nearby bay.
The Line at Santa Ana|Santa Ana, CA | 720, 600 GPM - 31', 21' TDH
The Line at Santa Ana is a new mixed-use infill development that will add 228 new apartments and 4,000 square feet of commercial space across several buildings. Romtec Utilities was hired to provide two engineered pumping systems that would discharge treated stormwater into the storm sewer.
City of Santa Paula | Santa Paula, CA
Romtec Utilities often supplies lift stations for new developments. In the Harvest at Limoneira project, a new residential development in Santa Paula, California, was in need of a wastewater lift station with a large wet well.
University of California | 720 GPM - 43.1' TDH
Adapting to the rising numbers of students seeking a higher education, UC Merced expanded their campus, and needed a wastewater lift station to accommodate new mixed-use residence halls.





