The construction of a new Home Depot required a large detention pond and a new pump station to handle stormwater from the commercial development. This economical pump station uses 7.5hp Ebara pumps in a duplex configuration to meet the required flow rates to empty the detention pond. Parallel force mains were included with valve cans to provide simple and inexpensive piping and control valves. This submersible system uses cost-effective precast concrete barrels and a monolithic base to construct strong and reliable sump.
West Mesa Industrial Park|Las Cruses, NM|733 GPM - 44' TDH
The US Army Corps of Engineers worked with Romtec Utilities to design this lift station to replace an existing septic system. The resulting package wastewater lift station met the high sewage flows of this publicly owned industrial complex. The submersible sewage pumps in a duplex configuration are explosion proof to meet the wet well space classification. An outdoor UL listed panel utilizes floats and a pressure transducer for intrinsically safe level controls. It also includes an autodialer for communications and a blower for odor control.
Pleasant Valley RV Park|Williston, ND|844 GPM - 38' TDH
A residential boom town of employees from nearby natural gas mining facilities needed a large lift station to handle over 1.2 MGD of wastewater. Submersible Ebara sewage pumps in a triplex configuration were included for the new and future pumping rates resulting from residential growth. The lift station controls are located in a nearby control building. The UL listed control panel utilizes floats for primary and backup level controls, an autodialer for communications, and a permanent onsite generator for backup power.
CCA Prison|Pahrump, NV|836 GPM - 72' TDH
These four package lift stations were designed to meet the high sewage flows of this commercial prison for municipal wastewater standards. Solids-handling pumps in a duplex configuration are aided by an effluent mixer designed to agitate solids inmates put into the system. A dual compartment, below-grade valve assembly holds the complete system valves and flow meters. The PLC panel is tied-in to an onsite generator for emergency backup power. A SCADA system handles liquid level sensing with a pressure transducer and floats for backup.
Suncadia Resort|Cle Elum, WA|800 GPM - 175' TDH
A growing resort community with golf courses needed this Romtec Utilities package lift station to meet super high sewage flows with high head conditions. The resort has ample property for expansion and needed a wastewater lift station that would also expand. Two submersible solids handling pumps were included in the original supply, but the mounting hardware for a third pump in a triplex configuration was included to allow easy expansion as more condos are constructed. An outdoor control panel is protected by a shelter and utilizes a pressure transducer and backup floats for liquid level-sensing.





